Filming Schedule for 'Hope is a Waking Dream'

We hope to film over the summer holidays, although this is a challenge as both Bea and I have different holiday dates. 
After a while of planning we have managed to find a couple of days when we are both free, we just need to confirm that our actors will be free as well. 
The most likely dates that we will be filming 'Hope is a Waking Dream' will be 15-21st August. 
At the same time as filming we hope to do a photo shoot for our promotional poster. 

This Saturday I will be going to Tesco, in Herne Hill to talk to the manager about filming 'Hope is a Waking Dream' inside the store. I hope that it is going to be possible for us to film, as it is an essential part of our story. 


Filming schedule we are aiming for:


Start filming at 9:30 am.

By 10am aim to finish filming the street scenes and white board scene - we may be a bit longer than this because we are warming up to using the camera and experimenting with different angles. So we may be filming until 10:20am.

The actors for the shop scene should aim to arrive on set by 10:30am, we will explain to them what they will be doing and check their hair, make-up and costume. All of this should be finished by 10:50 am.

Finish filming the scenes in Tesco by 12.

Begin to film the second street scene by 12:20. Finish by 1pm.

Actress playing younger sister should arrive on set by 1:10pm.

Begin filming scenes with younger sister by 1:30pm as we need time to brief our actress on what she will be doing and to ensure she is comfortable.

We are aiming to finish shooting our film by 3pm.